Road light installation
The height of the lamp, the installation height of the lamp, and the installation height of the same street lamp must be the same. The height of the lamp is equivalent to the elevation angle of the lamp width that needs to be illuminated on the road. The elevation angle of each street should be the same. When the lamp holder is adjustable, the center line of the light source should fall within the L3-1/2 range of the road width. Special lamps should determine the elevation angle of the lamp according to the light distribution curve
Attention to road light installation
1. Determine the installation location and method of the lamp and ballast. When the distance between the lamp and the ballast exceeds 2 meters, the three-core cable needs to be replaced
2. Use a socket wrench to unscrew the fastening bolts on the ballast box cover, remove the box cover, connect the cable, and press the nut
3. Close the ballast box cover and tighten the return bolt
4. Replace the light bulb, cut off the power supply first, and check whether the hanging chain is properly hung.
Landscape light installation
1. Wire pipe and steel pipe laying: The design selects wire pipe and steel pipe hidden application, and the construction is carried out in accordance with the construction technology standards of wire pipe and steel pipe number sub-project, and the pre-embedded pipe should be closely coordinated with the construction of Shi Jian
2. Threading: The specifications and models of the wires must meet the design requirements. The threading in the pipe should be carried out after the completion of the building structure and civil construction operations. When threading, pay attention to the wires of the same AC circuit must be worn in the same pipe. Different circuits, different voltages and AC and straight lines
3. Lamp installation: Check that the accessories in the lamp county are complete and whether the lamps meet the requirements. The wiring and installation in the lamp must be firm, neat and beautiful
4. After installation, power on to check whether the control is flexible
Buried lamp installation
1. Prepare the parts and tools before installation, switch the power supply, dig the embedded hole according to the outer diameter of the embedded part, and fix it with concrete.
2. After the embedded part is fixed, connect the input wire of the buried lamp with the external wire
3. Fix the lamp body assembly and embedded parts with screws
4. Fasten the face cover to the lamp body assembly with screws
5. After confirming that the above operation is correct, turn on the power supply
Lawn light installation
The spacing of lamps and lanterns is 0.5 meters high, and the spacing of 23-watt energy-saving lamps is about 11 meters; the spacing of garden lamps is about 25 meters, and the lawn lamps depend on the specific situation and requirements
Sure, some rockeries and pavilions will install more installation steps, open the lamp shell, install the light source and supporting electrical appliances, lead the lead wire from the threading hole to the bottom of the lamp pole, and then connect the lamp holder with the lamp pole. Pay attention to tightening the fastening screws, align the lawn lamp flange with the foundation embedded screw, stand vertically, use nuts or pads to level and then tighten the installation nut wiring. When the lawn lamp is wiring, use a wire not smaller than the power distribution phase wire as a grounding wire to connect the metal shell of the lamp or lamp post, and the ground wire is connected to the "ground" of the system.
The grounding electrode of the lamp pole must be firmly welded, and the joint must be lined with tin. When the PE protection wire of the street lamp power supply is connected with the grounding wire of the lamp pole, it must be pressed with a spring gasket and then screwed on the nut.
Wall lamp installation
Installation height - generally slightly higher than the eye level, about 1.8 meters; the distance from the working surface is generally 1.44 meters to 1.85 meters
Wall headlamp installation steps and attention
1. Mark the position where the expansion screw needs to be punched on the wall according to the hole on the hanging board of the wall headlamp. 2. Drill holes at the marking point, understand the line layout, and pay attention to the depth of the drilled holes
3. Drill the hole and put the expansion screw on it, and use a hammer or other thing to drive the expansion screw into the wall
4. Pass the wooden screw through the hole of the wall lamp hanging board and fix it on the expansion screw
5. Connect the hanging plate and the ceiling plate with screws, and then screw on the bald head screws to fix the ceiling plate
Spotlight installation
1. Pencil positioning
2. Open holes with electric hammer and insert expansion screws
3. Upper the base, pull in the wire, and apply the fixing screws.
4. Wiring head, spotlight installation part
Pay attention to installation, pay attention to arranging the position of the line, electrician and woodworker need to cooperate well, open the hole as far as possible, do not open large, must wear gloves when installing, do not leave fingerprints or stains, good installation process is convenient to disassemble
LED floodlight installation
1. First complete the lighting products, organize the installers, and provide the tools, materials, etc. that need supplies
2. After the lamps are arranged, they are fixed and wired, and reviewed to ensure that the installation quality is in place
3. After the LED floodlight is fixed and connected to the wire, when it is ready to light up, it is best to use a universal meter on the main power supply to check whether there is a short circuit of the wrong wire to ensure that it will not burn out.
After all are done and tested, conduct a review.
Wall washer installation
1. Soldering the LED lamp beads to the aluminum substrate with a soldering iron and a tin bar for later use
2. Test the welded board to light up to see if there is any virtual welding or no light.
3. After the test is completed, put heat dissipation silicone on the back of the aluminum substrate, put the plate into the shell, and proceed to the next operation
4. Solder the power supply to the positive and negative poles of the aluminum substrate, and then tie the two ends with tape for glue filling
5. Put it evenly and flat, not crooked or oblique.
6. Remove the tape the next day or afternoon after glue filling, glue and install the glass
7. Wire after installation. After completion, it can be used.